    2025-CH-1001-001-A

    Provide evidence to support that the Authority corrected the 11 unit deficiencies for the 5 units and 7 building deficiencies for 4 buildings with outstanding deficiencies.

  •  
    Status
      Open
      Closed
    2025-CH-1001-001-B

    Determine the frequency of its quality control reviews of its inspections and work orders and update its quality control policy, training materials, and other resources as appropriate to ensure that its quality control process is consistently implemented.

  •  
    Status
      Open
      Closed
    2025-CH-1001-001-C

    Support that it has implemented its quality control policy for (1) monitoring the effectiveness of its unit and building inspections to ensure compliance with HUD’s and its own requirements and (2) reviewing work orders to ensure that cited deficiencies are corrected in accordance with HUD’s and its own requirements.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-A

    Provide evidence to support that the Authority corrected the four non-life-threatening deficiencies for the three units with outstanding deficiencies.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-B

    Implement adequate procedures and controls to ensure that the deficiencies identified during annual self-inspections are properly categorized and corrected in a timely manner.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-C

    Develop and implement a plan to manage and reduce its backlog of work orders. This plan should include but not be limited to (1) assessing and addressing staffing needs; (2) creating a timeline for completion of the work orders to ensure that its properties are maintained in decent, safe, and sanitary condition and in good repair; and (3) providing documentation showing that it is on track to meet the completion timeframe.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-D

    Implement adequate procedures and controls to ensure that inspection reports are uploaded to the Authority’s electronic filing system and work orders are created in a timely manner. This process should include but not be limited to providing training to its staff on the Authority’s systems, establishing timeframes for the creation of work orders, and monitoring the work order process.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-A

    Provide evidence to support that the Authority corrected the 3 non-life-threatening health and safety, and 19 non-health and safety deficiencies.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-B

    Develop and implement adequate procedures and controls to ensure that (1) the deficiencies identified during REAC inspections are corrected in a timely manner and (2) documentation is maintained to support that repairs were made.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-C

    Implement adequate controls to ensure that the Authority’s information system properly tracks the completion of work orders.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-D

    Implement adequate controls to ensure that the correction of life-threatening deficiencies is reported to HUD accurately and in a timely manner.

Community Planning and Development

  •  
    Status
      Open
      Closed
    2025-FW-0001-001-A

    We recommend that HUD work with Connecticut and Shelby County to fully realize the program benefits by (1) assessing whether any of the current project activities need to be replaced with more viable project activities, thereby ensuring that any modifications to the project activities will lessen the susceptibility of rain and flood events; (2) assessing whether administrative funds have been properly allocated and charged to identify any possible cost savings; (3) determining whether enough administrative funds or other available funds exist to complete the administration of the grant project activities; and (4) developing and implementing a written plan of action that will assist with expediting the project activities that could reasonably be expected to be completed by the September 30, 2029, deadline.

  •  
    Status
      Open
      Closed
    2025-FW-0001-001-B

    We recommend that HUD conduct onsite or remote monitoring for the City of Minot and Tennessee, which have not had any monitoring since grant inception, to ensure that these grantees are on track to meet their program goals.

  •  
    Status
      Open
      Closed
    2025-FW-0001-001-C

    We recommend that HUD for grantees with delayed project activities (California, Connecticut, Louisiana, Tennessee, Virginia, New York City, Minot, and Shelby County), require each grantee to provide a detailed timeline with milestone dates of when projects should be completed and provide updates to ensure that grantees stay on schedule.

  •  
    Status
      Open
      Closed
    2025-FW-0001-001-D

    We recommend that HUD for its disaster-related program wide activities, revise the action plan and quarterly performance review checklists to a format that more specifically and directly addresses the subject program.

  •  
    Status
      Open
      Closed
    2025-FW-0001-001-E

    We recommend that HUD for its disaster-related program wide activities, require grantees to provide documentation showing that they have upfront collaboration with partnering entities in executing the grant program. If the grantee plans to hire contractors, HUD should ensure that grantees have a plan to quickly onboard contractors early in the program.

Chief Procurement Officer

  •  
    Status
      Open
      Closed
    2023-OE-0006-01

    Develop ALU engagement standards and incorporate them into acquisition policies and procedures.

  •  
    Status
      Open
      Closed
    2023-OE-0006-02

    Update guidance to clarify the different roles and responsibilities of the ALU, CO, CS, and COR.

  •  
    Status
      Open
      Closed
    2023-OE-0006-03

    We recommend that the Chief Procurement Officer develop, implement, and communicate requirements for program offices to establish written minimum roles and responsibilities for their respective procurement management functions, including but not limited to CORs, PMs, and SMEs.

Housing

  •  
    Status
      Open
      Closed
    2025-KC-1002-001-A

    Require Carrington to remedy HUD and the 27 borrowers in our sample with improper foreclosure filings and take administrative actions if appropriate.