U.S. flag

An official website of the United States government Here’s how you know

The .gov means it’s official.

Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.

The site is secure.

The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Exportar
Date Issued

Public and Indian Housing

  •  
    Status
      Open
      Closed
    2025-CH-1001-001-A

    Provide evidence to support that the Authority corrected the 11 unit deficiencies for the 5 units and 7 building deficiencies for 4 buildings with outstanding deficiencies.

  •  
    Status
      Open
      Closed
    2025-CH-1001-001-B

    Determine the frequency of its quality control reviews of its inspections and work orders and update its quality control policy, training materials, and other resources as appropriate to ensure that its quality control process is consistently implemented.

  •  
    Status
      Open
      Closed
    2025-CH-1001-001-C

    Support that it has implemented its quality control policy for (1) monitoring the effectiveness of its unit and building inspections to ensure compliance with HUD’s and its own requirements and (2) reviewing work orders to ensure that cited deficiencies are corrected in accordance with HUD’s and its own requirements.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-A

    Provide evidence to support that the Authority corrected the four non-life-threatening deficiencies for the three units with outstanding deficiencies.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-B

    Implement adequate procedures and controls to ensure that the deficiencies identified during annual self-inspections are properly categorized and corrected in a timely manner.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-C

    Develop and implement a plan to manage and reduce its backlog of work orders. This plan should include but not be limited to (1) assessing and addressing staffing needs; (2) creating a timeline for completion of the work orders to ensure that its properties are maintained in decent, safe, and sanitary condition and in good repair; and (3) providing documentation showing that it is on track to meet the completion timeframe.

  •  
    Status
      Open
      Closed
    2025-CH-1001-002-D

    Implement adequate procedures and controls to ensure that inspection reports are uploaded to the Authority’s electronic filing system and work orders are created in a timely manner. This process should include but not be limited to providing training to its staff on the Authority’s systems, establishing timeframes for the creation of work orders, and monitoring the work order process.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-A

    Provide evidence to support that the Authority corrected the 3 non-life-threatening health and safety, and 19 non-health and safety deficiencies.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-B

    Develop and implement adequate procedures and controls to ensure that (1) the deficiencies identified during REAC inspections are corrected in a timely manner and (2) documentation is maintained to support that repairs were made.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-C

    Implement adequate controls to ensure that the Authority’s information system properly tracks the completion of work orders.

  •  
    Status
      Open
      Closed
    2025-CH-1001-003-D

    Implement adequate controls to ensure that the correction of life-threatening deficiencies is reported to HUD accurately and in a timely manner.

Housing

  •  
    Status
      Open
      Closed
    2025-KC-1002-001-A

    Require Carrington to remedy HUD and the 27 borrowers in our sample with improper foreclosure filings and take administrative actions if appropriate.

  •  
    Status
      Open
      Closed
    2025-KC-1002-001-B

    Require Carrington to perform a review of loans affected by the system errors and when appropriate, remedy the borrowers or HUD.

  •  
    Status
      Open
      Closed
    2025-KC-1002-001-C

    Require Carrington to update its policies and procedures to comply with HUD requirements by reviewing eligible borrowers for streamlined options without unnecessary documents, notifying borrowers if they are ineligible for any loss mitigation options, and using best efforts to review borrowers for loss mitigation within 37 days of the foreclosure sale date.

  •  
    Status
      Open
      Closed
    2025-KC-1002-001-D

    Require Carrington to implement improved controls to prevent manual errors by performing additional review of all foreclosure actions and performing timely review of all documentation provided by the borrowers and third parties.

Housing

  •  
    Status
      Open
      Closed
    2025-KC-1001-001-A

    Require MidFirst to remedy the 24 borrowers in our sample with improper foreclosure filings or take administrative actions if appropriate.

  •  
    Status
      Open
      Closed
    2025-KC-1001-001-B

    Analyze MidFirst’s resolution of the manual process issues identified during its 2022 quality control review to verify that it remedied the borrowers or HUD and corrected the issues identified related to manual processing.

  •  
    Status
      Open
      Closed
    2025-KC-1001-001-C

    Require MidFirst to update its policies and procedures to comply with HUD requirements by placing foreclosure holds for loss mitigation requests made before the first legal filing.

Housing

  •  
    Status
      Open
      Closed
    2025-CH-0001-001-A

    Review the non-life-threatening health and safety and other deficiencies observed by the audit team and ensure that property owners and agents make the necessary corrections to the deficiencies as appropriate.

  •  
    Status
      Open
      Closed
    2025-CH-0001-001-B

    Determine the appropriate timeframe for when initial MORs should be completed for all properties that convert under RAD and issue updated guidance that includes a system to track the timeliness of initial MORs.