Assess its help desk system against other technical solutions and ensure that the help desk solution used captures complete data on technical support requests. This measure includes but is not limited to ensuring that sequence gaps are properly documented or do not occur, valid transactions are accepted by the help desk system, rejected transactions are identified, and the history of each transaction is retained.
2023-FO-0008 | Enero 24, 2023
Assessment of HUD’s IT Infrastructure To Support Extensive Telework
Chief Information Officer
2023-FO-0008-004-A
2023-KC-0001 | Diciembre 05, 2022
Ginnie Mae Did Not Ensure That All Pooled Loans Had Agency Insurance
Government National Mortgage Association
2023-KC-0001-001-A
Closed on Octubre 31, 2023$903,085,334Funds Put to Better UseRecommendations that funds be put to better use estimate funds that could be used more efficiently. For example, recommendations that funds be put to better use could result in reductions in spending, deobligation of funds, or avoidance of unnecessary spending.
Update and synchronize the SOP and the matching procedure. The updates should include notifications that provide issuers with unmatched loans adequate time to take corrective action to comply with the requirements of the MBS Guide to put $903 million to better use by ensuring that the appropriate agency insurance or guarantee is in place.
2023-KC-0001-001-B
Closed on Octubre 29, 2024Ensure that all necessary information regarding terminated VA loans is included in the matching process.
2023-FO-0004 | Noviembre 17, 2022
Audit of HUD’s Fiscal Years 2022 and 2021 Financial Statements
Community Planning and Development
2023-FO-0004-001-E
Closed on Septiembre 17, 2024Develop and document internal procedures to ensure that they will address the Program Office’s responsibilities within the departmental grant accrual validation policy.
2023-FO-0004-001-F
Closed on Septiembre 17, 2024Re-evaluate and adequately document justification for the establishment of the percentages and other key assumptions used to determine the accrual amount for each program in CPD’s accrued grant liabilities estimate.
Chief Financial Officer
2023-FO-0004-001-A
Closed on Julio 31, 2023Develop and issue a departmental grant accrual validation policy or update the existing grant accrual policy to include the validation process. The policy should include 1) specific control activities over the grant accrual validation and outline all of the specific roles and responsibilities; 2) a periodic review of the grant accrual validation to evaluate and reassess its continued relevance and control effectiveness, and ensure any changes are designed and implemented appropriately; and 3) a clear communication plan that requires formal and documented communications between appropriate program offices and OCFO to ensure the validation results are used to update the grant accrual methodology and subsequent period’s estimate, as appropriate.
2023-FO-0004-001-B
Closed on Agosto 10, 2023Develop and document internal procedures to ensure the OCFO’s responsibilities specified within the new or updated grant accrual validation policy are addressed.
2023-FO-0004-001-C
Closed on Agosto 10, 2023Develop and implement procedures to ensure that planning for the CPD grant accrual validation is done early in the accounting cycle to allow for: • Sufficient resources to be available to perform the validation of the prior year grant accrual. • Validation efforts to start earlier to allow for follow-up on non-responsive grantees or grantees that provided incomplete information. • Materiality risk to be considered when planning and evaluating the CPD grant accrual validation.
2023-FO-0004-001-D
Closed on Febrero 02, 2023Revise CPD Validation Review Instructions to specify documentation requirements similar to those provided to the grantee and specify verification of dates for when the costs were incurred.
2023-FO-0004-001-G
Closed on Julio 11, 2024As part of the validation process for CPD’s accrued grant liabilities, review CPD’s accrued grant liabilities estimation methodology to ensure that it is based on verifiable grantee supporting documentation and all assumptions and variables used for the grant accrual estimate were properly established, supported, and documented.
2023-FO-0004-003-A
Closed on Marzo 14, 2024Establish a formal policy addressing HUD’s federal awarding agency responsibilities under 2 CFR § 200.513(c). The policy should identify those involved in the process and their roles in addressing this single audit oversight function. The policy should also address how it will be carried out and documented.
2023-FO-0003 | Noviembre 16, 2022
Audit of FHA’s Fiscal Years 2022 and 2021 Financial Statements
Housing
2023-FO-0003-001-A
Closed on Agosto 02, 2023Establish change management and periodic reviews of control activities to ensure regulatory changes, such as Fiscal Service updates to the USSGL, are identified, analyzed, and assessed for potential needed changes to FHA’s established processes.
2023-FO-0003-001-B
Closed on Agosto 03, 2023Establish and ensure appropriate and effective communication protocols between OFAR, FHA, and HUD’s Office of Budget to ensure (1) funding type is clearly indicated within the SF 132 and clear communications are made in differentiating between definite and indefinite borrowing authority, (2) legislative changes in FHA’s borrowing authority are vetted with OMB to ensure appropriate treatment, and (3) – draft SF-133s are reviewed and vetted with HUD and FHA’s budget officers prior to OFAR’s finalization with Treasury and OMB.
2023-FO-0003-001-C
Closed on Junio 07, 2023Establish internal control procedures around the borrowings process to include verifying sufficient borrowing authority exists within the SF 132, prior to executing the borrowing request. Such verification should also be included as part of the borrowing review and approval controls.
2023-FO-0003-001-D
Closed on Septiembre 27, 2023Receive a final opinion from HUD’s Office of the Chief Financial Officer’s Appropriation Law Division on whether FHA was in violation of the Antideficiency Act.
2023-FO-0003-001-E
Closed on Agosto 10, 2023Implement procedures to enhance the review of all journal entries recorded in the general ledger by requiring a two-level review that includes the review of source documents for the journal entry (for example, the OMB approved SF 132).
2023-FO-0003-001-F
Closed on Junio 07, 2023Strengthen controls over the preparation of the SF 132 to the SF 133 reconciliation by preparing such reconciliations (1) first, with the unadjusted trial balance and later, with the adjusted trial balance and (2) at the fund level, with detailed documentation of differences, and with sufficient detailed explanations that describe the general ledger impact of the differences.
2023-FO-0003-001-G
Closed on Junio 07, 2023Perform a thorough review of the SF 132 to SF 133 reconciliations and work with Financial Analysis and Controls Division and other divisions and groups to resolve material reconciling items timely.
2023-FO-0003-001-H
Closed on Agosto 01, 2024Coordinate with the Deputy Assistant Secretary for Single Family Housing and HUD’s Office of the Chief Procurement Office (OCPO) in developing effective communication channels between FHA’s NSC and OFAR, and in developing effective monitoring controls to ensure the timely identification and remediation of issues, such as unprocessed documentation and inaccurate records, which may impact the balances reported within FHA’s financial statements.
2023-FO-0003-001-I
Closed on Agosto 01, 2024Develop effective detective controls to ensure HECM loan receivables are accurate and complete, exist, and FHA appropriately holds or controls the rights to any collateral property in connection with the receivable.